History

2021
Samarpan - a De-addiction and Mental Health Counselling Center was launched in Mumbai. A world class Residential De-Addiction Center was inaugurated in Mar-2022. Samarpan envisions to emerge as a globally recognized and preferred Mental Health Center, scientifically addressing substance abuse and psychological issues.
2020
Jasingpur Iron Ore Mines Auctioned Block (ML No: 0015) of MSPL Limited has successfully commeneced its Mining operations after obtaining all its Statutory Clearances on dated: 15.10.2020
2020
Karadikolla Iron Ore Mine Auctioned Block (ML No:0010)of MSPL Limited has successfully commeneced its Mining operations after obtaining all its Statutory Clearances on dated: 12.03.2020
2019
MSPL was declarded as preferred Bidder for Iron Ore Block (Erstwhile Lessee Jaisingpur Iron Ore Mine of M/s Ashwathanarayana Singh &Co.,ML No:2531) ,sandur Taluk, Bellary Dist Over an extent of 56.00Ha on dated:14.08.2019
2019
Resumption of Pathikond Iron Ore Mine of M/s PVS: After SC order in Samaj case the operation of the mines were Closed from 29.07.2011. The same was resumed on 10.01.2019
2018
MSPL was declarded preferred Bidder for Iron Ore Block (Erstwhile Lessee Sri H G Rangan Gouda ML No:2148), sandur Taluk, Bellary Dist Over an extent of 60.66Ha , on dated:06.10.2018
2018
MSPL was declarded as preferred Bidder for Iron Ore Block (Erst while Lessee Kanhaiyalal Dudheria ML No 2563) ,sandur Taluk, Bellary Dist Over an extent of 30.09 Ha, on dated: 06.10.2018
2016
MSPL was declarded as preferred Bidder for Iron Ore Block ( Erst While Lesse Karthikeyas Manganese ML No :2559 ),sandur Taluk, Bellary Dist Over an extent of 26.71Ha on dated:26.10.2016
2016
MSPL was declarded as preferred Bidder for Iron Ore Block (Erst While Lessee LMC ML No :2487) Block in Karadikolla Village ,sandur Taluk, Bellary Dist Over an extent of 86.12Ha on dated:26.10.2016
2013
Resumption of Iyli Guruntah Iron Ore Mine of M/s RMML Limited; After SC order in Samaj case the operation of the mines were Closed from 29.07.2011. The same was resumed on dated: 08.07.2013
2013
Resumption of Vysankere Iron Ore Mine of M/s MSPL Limited : After SC order in Samaj case the operation of the mines were Closed from 29.07.2011. The same was resumed on dated: 17.05.2013
2013
The Baldota Group of Companies receives their fourth ship- MV Indus Victory
2012
The Baldota Group of Companies receives their third ship- MV Indus Triumph.
2012
RMML's Gadag Gold Ore Processing Plant began its journey with an auspicious Bhoomi Pooja.
2011
The Baldota Group receives the delivery of their two ships- MV Indus Prosperity and MV Indus Fortune.
2011
The Baldota Group of Companies establishes a 1.2 MTPA pellet plant at Halavarti, Koppal district.
2010
MSPL Gases inaugurates an Air Separation Plant for the Indian Railways at the Rail Wheel Factory, Yelahanka, Bengaluru, on a Build, Own, Operate, Transfer Basis (BOOT).
2010
Vyasanakere Iron Ore Mine, was conferred with National Safety Award (Mines) for 2010 by the Hon’ble President of India, Shri. Pranab Mukherjee at a function held in New Delhi.
2009
The Baldota Group of Companies performs the Steel Cutting ceremony for the first ship at a shipyard in China.
2008
The Baldota Group of Companies forays into steel production with the inauguration of AARESS Iron and Steel Limited (AISL) across 1000 acres at Halavarti Village, Koppal.
2008
Mr. Narendrakumar A. Baldota was awarded the prestigious “Lifetime Achievement Award” by the honourable President of India, Smt. Pratibha Devisingh Patil. This honour was conferred as a part of the 11th set of “Niyat Shree” and “Niyat Bandhu” awards of Federation of Indian Export Organisations (FIEO) in New Delhi.
2007
MSPL installs windpower units of 30 MW generation capacity in Surajbari, Kachchh district, Gujarat.
2006
GECPL laid its foundations with a focus on critical environmental issues.
2006
The Baldota Group’s corporate office is inaugurated by Smt. Vasanti Devi A. Baldota.
2006
MSPL Gases commissions a 50 TPD captive oxygen plant on a Build,Own,Operate basis (BOO) at VISL, Bhadravati.
2006
MSPL inaugurates the MSPL AHB Siding- a new private railway siding located adjacent to our EOU Unit-II
2006
MSPL acquires 8 railway rakes across the breadth of the Indian subcontinent to facilitate the transportation of Iron Ore
2006
MSPL Gases expands its business activities at Bhadravati with a 50 TPD oxygen plant and a 4 TPD plant at Sholapur
2005
The Baldota Group undergoes a Corporate Identity Rejuvenation with the introduction of the new and improved logo
2005
Shri Narendra Kumar Baldota inaugurates the Export Oriented Unit (EOU) in the Ingalgi Village,Hosapete
2004
MSPL receives an award for “Highest Investment” in the field of renewable energy with an investment of 460 crores for producing 105 MW of wind energy
2002
RMML installs 1.5MW windmills in Satara, Maharashtra
2002
RMML commences gold exploration in Karnataka with a Reconnaissance Permit (RP) in Gadag Schist-Belt
2001
MSPL bags TERI (Tata Energy Research Institute) Corporate Environmental Award
2001
The Baldota Group establishes the Smt. Vasanti Devi Baldota Blood Bank at Hosapete
2000
MSPL’s R&D laboratory effort yields the explosive power of Liquid Oxygen soaked fuel cartridges-VILOX explosives (Liquid Oxygen Explosive)
2000
MSPL reaches the 1.5 million tones production of iron ore
2000
As part of Environment Management System, MSPL establishes a weather station at the Vyasankere Iron Ore Mine for self-recording of rain and prediction of weather
1999
MSPL is Certified with ISO 14001 by the BVQI, Netherlands
1999
RMML receives ISO 9002 certificate for mining operations
1999
MSPL Limited reaches the 1 million tonne milestone with the accomplishment of the production and sale of 1 million tones of ore
1999
MSPL is awarded the ISO 14001: 2004 for complying with stringent environment management standards in Mining, Benefication and handling of ore
1997
MSPL receives the ISO 9001 certificate
1996
MSPL starts exports of Iron Ore to China
1990
MSPL, through the Federation of Indian Mineral Industries (FIMI) institutes the Abheraj Baldota Environment Award in the memory of founder Late Shri Abheraj Hirachand Baldota
1983
MSPL’s first gas plant laid its foundation
1976
The Abheraj Baldota Foundation was established
1971
The first tree plantation drive was initiated by the Baldota Group of Companies
1961
The Baldota Group of Companies was formed under the able leadership of Shri Abheraj Hirachand Baldota

Request A Quote