Overview
Baldota Steel & Power Limited (BSPL Limited) was founded as part of the Baldota conglomerate. BSPL targets to drive the Indian manufacturing industry as envisaged in the NSP Policy Vision 2030 simultaneously aiming to uplift the local economy and drive national economic growth.
Proposed steel plant is strategically located in Koppal district of Karnataka and has seamless road as well as railway access & to major ports.
The Integrated steel plant of 3.5 MTPA in 2 phases & 220 MW power plant along with 100 MW solar power is well conceptualized to be the lowest Cost producer with quality at par with global benchmark standards.
The team has already finalized to put up a state of art , safe and level 4.0 Automated plant and is closely working with leading Indian engineering consultants & construction companies to get the conceptual phase to a final shape.
The Equipment sourcing will be done from Major technology supplier from across the globe. The Market study report & Feasibility report is closed and in place along with Environment clearance for both Phases.
The plant is also envisaged to be Zero Liquid discharge (ZLD) & net Zero Abiding all Effluent & fume treatment norms, the plant also intends to be a carbon Neutral plant to meet global standards.
Project Progress
- Oct 2018
- July 2021
- July 2022
- Aug 2023
Mining Reserve (Captive)
120 MnTPA access secured for + 20 Years of Iron ore supply to ISP.
Stability in supply of Ore & Other Raw material.
Rail & Road Seamless logistic to ISP Complex.
Major Statutory Approval
Environment Clearance (EC) secured for 3.5 MTPA.
Forest Clearance Embedded and secured with EC.
SHLCC Secured for Govt. of Karnataka.
Railway
In-Principle Approval for railway siding in Secured
ESP & DPR is complete & Approval From Railway is in progress
Infrastructure set-up including land / right of way being led by BSPL.
Engagement with MN Dastur Co.
ISP - Contract awarded
ISP - Techno Economical Feasibility Report submissionq1
Power
70 MW Power sanction available.
MRSS construction completed & is in Operation.
Land For Steel Plant
1000 Acres of Land is already in possession for BSPL.
Necessary approvals well in place for use for ISP.
Boundary Wall & Gates construction is being taken up.
Water supply
12.5 MGD + 5 MGD approval for access to water from Tungabhadra river.
Pipeline FC Approval in Fast track & Construction to Start.